Moco Moco
Guyana
2024
Pelton Turbine, Refurbishment

Number of units

2

Total Output (kw)

787.4

Head (m)

206.90

Flow (m³/s)

0.22

Diameter (mm)

488

Scope of Supply

Pelton Turbines (2x 0,22 m³/s), Generator, Flywheel, HPU, Inlet Valve, Control & Protection Equipment, Switchgear, Auxiliary Supply System
Copyright © 2026 GUGLER Water Turbines GmbH Inspiro Theme by WPZOOM
Scroll to top