Kumu
Guyana
2025
Pelton Turbine

Number of units

1

Total Output (kw)

1677.7

Head (m)

523

Flow (m³/s)

0.36

Diameter (mm)

788

Scope of Supply

Pelton Turbine (0,36 m³/s) , Generator, Flywheel, HPU, Inlet Valve, Control & Protection Equipment, Switchgear, Auxiliary Supply System, SCADA